Gateway Upgrade South Stage 2a

GUS 2a was yet another successful partnership with clients McIlwain Civil Engineers on the intersection of the Gateway Motorway and Mt Gravatt Capalaba Rd.

Delivered as part of the Motorway Upgrade project required the Design, Supply and Delivery of an architecturally patterned prestressed Noise Wall utilizing an oxide based colour throughout the panels.

A large challenge for the project was the overhead electricity feed that made traditional carnage not possible for a large section of the works. The experienced team at Fenco derived an alternative method handling the panels through clever design that eliminated the risks.


Project Synopsis:

  • coloured-concrete-finish
  • patterned-finish
  • prestressed-concrete-acoustic-fencing